Client:
BMD Constructions Pty Ltd
Timeframe:
1 Month
Description:
In this project, a CCTV survey was completed on newly constructed stormwater drains at Northshore Hamilton on Remora Road. Drain Cam worked with BMD Constructions to organise a drain cleaning company to clean the drains directly before surveying.
Challenges:
One of the challenges was working around the high tides from the Brisbane River, which meant creating flexible survey schedules for certain drains.